| | SEPTEMBER 202119competence level and my past clients knew my performance driven personality. Hence, it was not very difficult to bridge the gaps. When I started VIKRAN at the age of 49, I started from zero and building from zero to 500 crore company in just over four years was not a cake walk but it has been an experience in its own. From last years to 600 Crores and beyond, with our current speed of project execution capability, we have been able to stabi-lize the system in place and the highest level of recognition and on-top of that cus-tomer satisfaction, it really gives me a lot of happiness, and I think this is the most satisfactory thing that I can count on.Overcoming all the stumbling blocks in our way, today, we have come a long way and achieved numerous milestones. Bagging an award is one thing but we are able to place all the systems, processes, ethics, value driven culture in the organization which is steering VIKRAN Engineering towards a performance driven work culture.What are the key strategies that you have adopted to execute the operations of the firm?We are very proud of the projects that VIKRAN Engineering has been executing which most of the top EPC companies have been reluctant to show their interest in. Today, we are exhibiting projects across 13 states and while this is challenging task, we have a highly experienced Top management between me and my brother Mr.Avinash Markhedkar we have a combined experience of more than 6 decades in various sectors and countries we are able to leverage this experience and come up with strategies that have resulted in VIKRAN successfully executing projects upto seven months ahead of the schedule. We have already executed projects in 14 dis-tricts of Bihar and have a presence right from Jammu&Kashmir to Telangana in our short journey till now we have successfully executed about 13 projects whichwere executed in very short duration of time. As a part of diversification of business, the key strategies adopted were:01. We will continue to focus on Power T & D Projects up to 765 kV Sub-Station, Transmission lines & Power Distribution Projects in India as well as Overseas.02. We are building our strength to cater Railway Electrification Projects and are successful in bagging one order.03. We are all set to enter in Smart Infra structure project and water distribution segment and will be focusing in 4 to 5 states in the country.
<
Page 9 |
Page 11 >